Skip to main content

Blog entry by Robbin Ayers

How did Texas Lose its Bid for Tesla's 'gigafactory'?

How did Texas Lose its Bid for Tesla's 'gigafactory'?

The incentive package also includes 20 years free from sales tax and 10 years free from property tax, depending on Tesla's ability to meet performance expectations (like investing $3.5 billion in Nevada). The first phase is more than double the capacity of a similar sized factory in Asia, said Yoshihiko Yamada, executive vice president of Panasonic, who was on-site working with Tesla's engineers. Take a tour inside Tesla’s first Gigafactory. Water is scarce in Nevada, and some of the water for the Gigafactory is piped from a treatment plant in neighboring Washoe County. In 2019, staff at Gigafactory Nevada refused entry to U.S. 7,557 by June 2019, mostly Nevadans. Hirsch, Jerry (June 2, 2015). "Elon Musk: 'If I cared about subsidies, I would have entered the oil and gas industry'". Quartz. Archived from the original on October 19, 2016. Retrieved January 6, 2017. it's being built as a series of mini facilities, each one iterating on the design of the last. Reno Gazette Journal. Retrieved October 25, Baji999 Live Casino 2016. It's a real get things done state.

  • Share

Reviews


  
×